FaLang Language Switcher

Bathroom remodeling

Part 2nd of the renovation, on the post from a day before you can see the room with removed bathroom wall. Here view from inside of the bathroom. When we took the job bathroom tiling was already started by another company which left the job undone few months ago, we continued from the visible point on. The task included: tiling, raising the floor to fit the trap for 'walk in' shower, wiring water heater, installing toilet and sink, and obviously the door.

SP Facebook